SFP-DD to SFP-DD-100G-AOC-70M230FT 100G SFP-DD 2 x 50G PAM4 Active Optical Cable, 70m (230ft)

SFP-DD to SFP-DD-100G-AOC-70M230FT 100G SFP-DD 2 x 50G PAM4 Active Optical Cable, 70m (230ft)

The SFP-DD to SFP-DD-100G-AOC-70M230FT compatible assembly is a 100G AOC cable for Generic hosts, built in 70m (230ft) with SFP-DD to SFP-DD. It serves as one complete direct-attached link, while the compatibility and diagnostic checks below address the host-specific identification needed in a mixed-equipment environment.

OEM Part Number: SFP-DD to SFP-DD-100G-AOC-70M230FTHT Part Number: SFP-DD to SFP-DD-100G-AOC-70M230FT

Product Highlights

  • HT-manufactured AOC assembly in 70m (230ft)
  • 100G connectivity at 100Gbps
  • Interface configuration: SFP-DD to SFP-DD
  • Fixed length and part number: 70m (230ft), SFP-DD to SFP-DD-100G-AOC-70M230FT
  • Cable construction: OM4
  • Maximum power consumption: ≤3.5W
  • Minimum bend radius: 60mm

Specifications

HT Part NumberSFP-DD to SFP-DD-100G-AOC-70M230FT
ManufacturerHT
Connector TypeSFP-DD to SFP-DD
Max Data Rate100Gbps
Cable Length1m (3ft)
Cable TypeOM4
Wavelength850nm
Minimum Bend Radius60mm
Transmitter TypeVSCEL
Receiver TypePIN
Power Consumption≤3.5W
Power supply3.5V
CDR (Clock and Data Recovery)TX & RX Built-in CDR
Modulation Format2x 50G-PAM4 to 2x 50G-PAM4
DDM/DOMSupported
Commercial Temperature0 to 70°C (32 to 158°F)
ProtocolsSFP-DD MSA, SFP-DD MIS

Signal and Lane Configuration

The listed modulation format is 2x 50G-PAM4 to 2x 50G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.

Position Within the Length Range

SFP-DD to SFP-DD-100G-AOC-70M230FT is the longest of 12 verified length options in this family. Compared with SFP-DD to SFP-DD-100G-AOC-50M164FT at 50m (164ft), it provides 20m of additional reach for a longer vertical drop, a wider rack or an adjacent-cabinet route. Confirm that the complete path requires this length, because unused slack still needs supported, bend-safe storage.

Mixed-Vendor Network Operation

A mixed-vendor link should be documented at both ends, not treated as one generic connection. Confirm which OEM identity each host expects and whether the two ends use the same compatibility requirement. The related brand links below help locate equivalent-length assemblies, while the physical form factor and lane arrangement must still agree across the complete path. For this assembly, the minimum bend radius is 60mm; the stated power consumption is ≤3.5W.

Power and Thermal Planning

The rated power consumption is ≤3.5W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.

Cable Construction and Routing

This assembly uses minimum bend radius 60mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.

Network and Protocol Considerations

The intended application is determined by the host interface and protocol support. Listed interface and protocol references include SFP-DD MSA, SFP-DD MIS. Confirm that the host firmware and port configuration support the same operating mode.

Integrated Optical Assembly

The optical engines and fiber are permanently integrated into this AOC. There are no detachable optical modules to clean or exchange. Handle the complete assembly by its connector housings and cable, and keep both ends matched to the same interface specification.

Length Selection and Installation Planning

Choose SFP-DD to SFP-DD-100G-AOC-70M230FT when the measured managed path justifies 70m (230ft), not simply to leave a large spare coil. Additional reach can simplify adjacent-rack routing, yet unused cable still needs bend-safe storage and ventilation clearance. Keep identification visible so this extended version is not confused with shorter spares. The next shorter verified assembly is SFP-DD to SFP-DD-100G-AOC-50M164FT at 50m (164ft), which is the better comparison when the managed route leaves substantial unused cable.

Generic Compatibility and Factory Testing

Testing addresses the brand-specific identification as well as the operating link and available diagnostics. The same physical cable family can require a different host identity for another equipment vendor, so the intended platform should be supplied when a deployment combines multiple brands or unusual hardware revisions. Where supported by the host, receive activity and diagnostic indications are reviewed together with the established link.

Ordering Information

For mixed-vendor projects, identify the equipment at both ends along with the OEM reference, length and quantity. Order each compatibility version under its own part number. If spare assemblies are required, list them separately so labels and test records remain unambiguous. Keep SFP-DD to SFP-DD-100G-AOC-70M230FT associated with 70m (230ft) throughout the order and receiving record.

Quality Assurance and Packaging

Both ends are inspected and the complete assembly is powered up for a functional check before packing. Connectors are protected individually and the cable is secured without tight bends. Optional labels can distinguish host brand, OEM reference and length for easier spares management. Neutral packaging and customer-specific packing documentation are available on request.

Frequently Asked Questions

Is this an original equipment manufacturer cable?

No. It is manufactured by HT under our own manufacturer identity.

Can different brands be connected with the same assembly?

Only where both hosts explicitly support the complete interface and compatibility arrangement. Document each end and select the appropriate brand-specific product when required.

Does this order code cover multiple lengths?

No. SFP-DD to SFP-DD-100G-AOC-70M230FT refers here to 70m (230ft). Every other verified length has a separate part number and page in the length list.

Are separate transceivers or patch leads required?

No. This is one complete direct-attach assembly. The ends are not detachable modules and should not be separated from the cable.

Shipping and Lead Time

Available stock is generally dispatched within one to three working days after order confirmation, with production lead times advised for larger quantities. Worldwide courier services are available, with air or sea freight for consolidated shipments; freight-collect delivery and coordination with a customer’s logistics provider can be arranged.


Malaysia Fiber Optic Supplier

Malaysia Fiber Optics
Factory Address: Block 5, Wangtang Industrial Park,Nanshan Area, Shenzhen,China
Malaysia Office: 68000 Ampang,
Selangor, MY
https://www.fiberoptic.com.my